| Device | 
| D4K™: CS version 9.0 and higher | 
| Pro XL™: CS version 3.0 and higher | 
- 
                                                            Navigate to the Check Projection Power section of the Generate Mask workflow and follow the instructions to initiate the projection power check. → If the projection power check fails, the following screen appears: 
- 
                                                            Select Continue to begin projection power adjustment. 
- 
                                                            Place the USB light sensor in the center of the calibration spot projected onto a material tray and select Next to begin calibration. 
- 
                                                            When prompted, select OK to confirm the adjustment. → Projection power has been adjusted successfully. 
- 
                                                            Proceed with generating a compensation mask, see Generate Mask. 